Our customer was installing i410 weighing systems on all loading points at the cement factory in Rugby. Precise control of the amount of product being loaded to the lorries was required. The was transferred to a Rockwell SLC PLC and then onto an Intouch SCADA system. The SLC model only worked with Modbus data so we needed to find a gateway that would connect to both systems and pass data through seamlessly. We also had to work during weekends on a very tight schedule as the plant would only stop for a few hours on a Sunday to test the installation. Any issue with it and we had to revert back to the existing weigh system.