We undertook a detailed utility survey at a brewery in the midlands. The assessment evaluated the condition and efficiency of each of the utilities in the brewery. From the assessment, a detailed report identifying the current usage and state of each system, with an outline of the foreseen issues was documented. The report also detailed Malone Groups’ advisory design solutions to mitigate future issues.