This project involved the assessment of the necessary design requirements for the replacement of redundant PVPP and Kieselguhr filtration system in a brewery. The study evaluated the current filtration requirements along with any future production capacity requirements to size the new filtration set. This was then developed into a design to tender document that identified all process/ services pipework along with electrical and automation requirements were identified for the new fully automated membrane filtration system.