In this project we undertook a design study to installation and canning line into an existing facility. The intent of this study was to provide the right level of information to allow an informed decision to be made by the company’s board. The proposed location for the new can line was overlaid into the site’s layout and the associated pipe runs were identified sized. The conceptual design was then costed alongside the supporting ancillary equipment for supply.