The project involved the installation of a new 4,000kg/hr and relocation of existing two 500kg/hr steam boilers to a purpose built boiler house complete with steam generation equipment and subsequent steam distribution pipework system. The distribution pipework system fed a number of industrial sized ovens, kettles and soup generation rooms. It also fed a domestic hot water steam heat exchanger and associated high pressure pipework distribution system. The services design inclusive of the above consisted of connecting to existing natural gas, compressed air and water distribution networks within the existing production facility. The production facility continued to operate whilst the new installation was complete with a seamless transfer of services.